Engineer Trainee
Company - THDC INDIA LIMITED
Location - Uttarakhand
Experience - Fresher
Field - Engineering
Educational Qualification
- Courses: BE, BTech
- Stream:
- Mechanical
- Civil
- Electrical
- Electronic
Selection Procedure:
- The Eligible candidates must have appeared for Graduate Aptitude Test in Engineering (GATE) 2022. Candidates shall be shortlisted based on GATE 2022 score/performance from among the candidates who will apply against the advertisement for the post of Engineer Trainee (Civil/Electrical/Mechanical) in THDCIL.
- The normalized score of GATE 2022 will form basis of shortlisting. Merit List shall be separate for General/SC/ST/OBC(NCL)/EWS/ PwBDSs category.
- In case the GATE score-2022 of two candidates are same then marks obtained in Qualifying Examination (Engineering Degree) will form the basis, in case the marks of Qualifying Examination (Engineering Degree) is also the same then marks obtained in Class XII will be taken into consideration, in the case the marks of Class XII is also the same then marks obtained in Class X is also same then Date of Birth will be taken into consideration for preparing merit between two candidates and person born earlier shall be considered.
- The Selection Process consists marks obtained in the corresponding paper of GATE 2022 and Personal Interview. Please note only GATE Score of year 2022 is valid for the recruitment
Experience
- Freshers
Note:
- Age Limit : Engineer Trainee – 30 years
- Total Vacancy : 45
- Last date for Application : 01 August 2022
For More Details : Click Here
How to Apply :
All eligible and interested candidates can apply for this position by clicking below Apply button.
About Company
THDC India Limited is a leading Power Sector and Profit-making Public sector Enterprise and registered as a Public Limited Company in July-1988 under the Companies Act,1956. THDCIL was conferred ‘Mini Ratna’ Category-I Status in Oct-2009 and up-graded to Schedule ‘A’ PSU in July-2010 by the Govt. of India.
The Equity of Company was earlier shared between Govt. of India and GoUP in the ratio of 75:25. Pursuant to Strategic Sale, the Share Purchase Agreement was executed between NTPC Limited and President of India on 25th March, 2020, for acquisition of legal and beneficial ownership of equity held by the President of India in THDC India Limited. After Strategic Sale, Equity in THDC India Limited is shared between NTPC Limited and Government of UP in a ratio of 74.496 and 25.504.
The Authorized Share Capital of the Company is ₹ 4000 Cr. and paid up capital as on 30th Sep’2021 is ₹3665.88 Cr. THDCIL started earning profits from first year (2006-07) of commercial operation of its maiden project i.e. Tehri HPP (1000 MW) and THDCIL is a consistently profit-making company since then.
The Equity of Company was earlier shared between Govt. of India and GoUP in the ratio of 75:25. Pursuant to Strategic Sale, the Share Purchase Agreement was executed between NTPC Limited and President of India on 25th March, 2020, for acquisition of legal and beneficial ownership of equity held by the President of India in THDC India Limited. After Strategic Sale, Equity in THDC India Limited is shared between NTPC Limited and Government of UP in a ratio of 74.496 and 25.504.
The Authorized Share Capital of the Company is ₹ 4000 Cr. and paid up capital as on 30th Sep’2021 is ₹3665.88 Cr. THDCIL started earning profits from first year (2006-07) of commercial operation of its maiden project i.e. Tehri HPP (1000 MW) and THDCIL is a consistently profit-making company since then.
THDCIL was constituted with the sole objective to develop, operate & maintain the 2400 MW Tehri Hydro Power Complex (Tehri HPP-1000 MW, Tehri PSP-1000 MW and Koteshwar HEP-400 MW), and other Hydro projects. The Corporation has grown into a Multi-Project Organization, with Projects spread over various States as well as neighboring country, Bhutan. it has also forayed into generation of electricity from renewable energy sources and thermal power plants. Presently, THDCIL has a portfolio of 11 projects (Hydro, Thermal, Wind & Solar), with a total capacity of 4696 MW. This, includes 1587 MW operational Projects (Tehri HPP-1000 MW, Koteshwar HEP-400 MW, Dhukwan SHP-24 MW, Patan Wind Farm-50 MW, Devbhumi Dwarka Wind Farm-63 MW and Kasaragod Solar Power Plant -50 MW) and 2764 MW under Construction Projects ( Tehri PSP- 1000 MW, VPHEP 444 MW and Khurja 1320 MW) . The other projects are under various stages of development / implementation. Further, THDCIL is also developing 2000 MW UMREPPs ( 600 MW capacity of Solar Park, each at Jhansi and Lalitpur District and 800 MW at Chittarkoot District of UP) through SPV (a JV of ‘THDCIL’ and ‘UPNEDA’ named ‘TUSCO’) in the state of Uttar Pradesh.



-min.png)


0 Comments
If You Have any Doubts, Please Comment Us